GOURIKWA POWER STATION – BALANCE OF PLANT PIPING



PROJECT DESCRIPTION

The Scope of the project included the drawing of Piping Instrumentation Diagrams and the 3D layout design of the balance of plant piping (services piping) to supply 5 off 150MW Siemens gas turbines. All components were codified using the KKS number system.

The project was done in 2 phases over a period of 3 years.

Phase 1
The 3D model included the following plant areas which supplied 3 gas turbines:

  • Fuel unloading/gantry
  • Fuel treatment
  • Fuel forwarding pumps and distribution piping
  • Fire protection and detection systems
  • Demineralized and potable water distribution systems
  • Compressed air system

Phase 2
The 3D model included the following plant areas which supplied 2 gas turbines:

  • Fuel unloading/gantry
  • Fuel treatment
  • Fuel forwarding pumps and distribution piping
  • Fire protection and detection systems
  • Demineralized and potable water distribution systems
  • Compressed air system